Sunday, 10 March 2013

Phase 2 Starts...

Sunday 10th March

I'm back in Dhaka, and it feels hot -great for poo drying, I can't wait to get started!

A lot has happened since my last visit, and I'm trying to get up to speed before we go to site tomorrow.  This is what I think has happened on site:


Although I'll confirm tomorrow!

The team here at WA Bangladesh have also done some training with the local sweepers in Faridpur around health & safety matters, and raising awareness of the laws regarding their work - where they can/ can't dump waste etc.  It sounds like it was a very popular session, with 20-25 attendees at the 2-day course (for most of them, their first ever training session in classroom setting!) held at the BRAC Training Centre.  It was a good opportunity for them to get together and discuss issues in their work.

Next I'm off to see Dr Zahid at the icddr,b to check arrangements for the sludge testing for this next phase of work...


Thursday, 6 December 2012

Last visit to site this year...

Wednesday/Thursday 5th/6th December

After a couple of days back in the WaterAid offices in Dhaka, it was time to return to site for one more time before I leave Bangladesh.

We had a brief meeting with the Mayor of Faridpur, a lovely chap, who is popular and has been in the post for several years.  His support for this project has been appreciated by all those involved, and hopefully we will maintain this good relationship.

Meeting the Mayor of Faridpur (cream shirt to my right) - please excuse the unsettling gentleman pictured on the desk calendar!
We downloaded another load of data, and the results are looking pretty consistent:

Test results for the 10 days of the trial
The plastic roofs are raising the temperature by about 10 degrees, with the metal and thatch a few degrees cooler than ambient.  

The filter beds are outperforming the flat beds significantly, after 10 days, the sludge in the flat beds was still very watery and increasingly odourous.  The sludge in the filter beds is now a very thick semi-solid and clumping together.  It could easily be removed and mixed with woody organics such as rice-straw.
 
Sludge in the thatched filter bed

Comparison between three samples from the flat beds (left) and filter beds (right)

So, we now know that a clear/ translucent plastic roof on a filter bed is the optimum roofing material and base design.  We're now planning the next round of tests.  We want to explore controlling air tightness and ventilation, and of course the obvious missing comparison - with no roof at all (remembering that the reason we have roofs are to enable performance during the rainy season, it may be that the remainder of the year, they could be open).

I'll update more once I'm back in the UK, but for now, I've got a plane to catch...


Sunday, 2 December 2012

A trip to the University of Dhaka

Sunday 2nd December

This morning we visited Dr Zahid at the icddr,b again, and collected (back) small parts of our samples to take to Prof Hamida Khanum, a parasitologist at the University of Dhaka.

Dhaka University - a lovely campus, with buildings over 300yrs old
Prof Hamida Khanum will be undertaking some further tests for us, to determine the number of viable helminth eggs in the samples.  This is important to see if our process will inactivate them at all - although she cautioned that one cannot really 'kill' them, as they are so tough - they will merely wait until the right conditions arise, and then develop.  All you can do is ensure good hygiene practices, particularly handwashing, and prevent contamination that way.  Still, it will be interesting so see what kind of numbers we are looking at.




Friday, 30 November 2012

Initial results and reflections


We have all learnt a lot so far, and the current reflections on the design and the approach are:

  1.  Lifting the roofs - We should add handles to the short edge of each of the roofs to enable easier lifting and removal.  They could even be hinged and propped in future iterations.
  2. Delivery process - We need to think about how to safely unload and pour in sludge from barrels/ containers on a pick-up truck.  There was only one major slippage when we were watching, but it resulted in a 150L container falling about half a metre and splashing many of the sweepers – one even got some in their eye.  Luckily we had a tubewell on site and amongst all the resultant shouting and arguments, they could all wash before recommencing work.
  3. Treating and controlling the effluent runoff – particularly when the sludge is first poured into the beds, a significant amount of water drains through the beds and into the soakaway.  Should we control this flow, and only allow it to drain at a certain rate to try and enable treatment of the effluent as it passes through the bed, or should we build an accompanying reedbed to capture and treat it?
  4. Defining ‘sludge’ – this is a tricky substance to define, and our first batch, delivered by vacutug was only the wastewater component of a septic tank’s contents.  The next was mixed sludge and wastewater, and the last I think we got somewhere near what we were expecting.
  5. Increasing temperatures - our first few days of results show temperatures topping out in the high 30's for the plastic roofed beds - we'd need to hit 50+ for 5 days for pathogen reduction. We'll have to wait for the results from the lab to see what kind of die off we will achieve here.  


Oh and by the way, I'm now comparatively famous in Faridpur...



The Sludge settles

Wednesday 28th November

This morning we convened again at Practical Action’s offices:

Practical Action's Faridpur Office
I was shown a photo in the paper of the landowner giving over the rental agreement to the Major for this project (the municipality are paying the rent for the site), and told that my picture would be in there tomorrow! I dread to think which photo they'll use!


We then went to the site via a hardware shop / workshop that had welded us up a rake.


After lashing it to a bamboo shaft, we proceeded to rake over each bed in turn, taking the roof off and mixing the contents of each bed. This took about an hour in total. 





I made some qualitative observations, rather than taking moisture sensor readings.  All the beds were now much more pastey-soupy (I told you we were lacking adjectives) with thicker material at the end where the sludge had been initially poured in.  When we were taking the samples, it was much more stratified, with a foamy scum on top, a watery mid layer and a thick paste on the bottom.

Once we'd done raking, the weather station was repositioned, as there were concerns that it was being shielded by the trees.
New position for the weather station

View across the site


The Morning after the night before


Tuesday 27th November

In the morning we went back to site and surveyed the situation.  The tanks now had had the following volumes of sludge put into them:

1 – Filter bed with metal roof: 580L
2 – Filter bed with plastic roof: 510L
3 – Filter bed with thatch roof: 560L
4 – Flat bed with metal roof: 490L
5 – Flat bed with plastic roof: 490L
6 – Flat bed with thatch roof: 490L

The reason for the differences is the assortment of containers the material was delivered in.

We took the roofs off while I prepared the sampling materials.  We had screw top plastic jars, plastic spoons, and gloves.  I labelled up each of the jars and set them out on the sides of each of the tanks.  Suman and I put some plastic gloves on, and started spooning in the sludge into each jar.  The spoons were discarded after use and Opel collected them all in a rubbish bag.  At this point the smell really wasn’t too bad, it was more a revulsion at the collecting part!  The sampling process took about an hour.

Me at the laboratory desk preparing the sampling equipment

Setting out the jars - three samples were taken from each bed

Hopefully this will be enough to test
Taking a sample from the drainage pipe
 We wiped down all the jars with antiseptic wipes just to clean off any traces of spills or splashes, and packed them with ice in a coolbox and bag, making sure they would remain upright for the journey into Dhaka.

Packing the samples on ice to take to Dhaka

Before the roofs went back on, I scurried around with my laptop, and downloaded information from the sensors.  I also tried to use the moisture sensor I’d brought, but the batteries had run down, and we had to get some replacements from town.  I wasn’t very convinced by the readings I got – one bed may have been clearly more liquidy than another, but the sensor was saying that it had a lower VWC (volumetric water content).  I suspect this may be because they are all >85% moisture and it’s confusing the sensor.  Once they dry out a bit, I’ll re-try.

I spent the remainder of the afternoon creating some pretty graphs of the initial results and trying to send a few emails on the rather limited internet connection here.

Sludge, Round Two


Monday 26th November - WARNING, THIS POST CONTAINS IMAGES OF AN EXPLICIT NATURE, NOT TO BE VIEWED WHEN CONSUMING FOOD!

We inspect the site, and discover only a very thin layer of sludge remaining in the tanks – the influent must have been >90% water, the bulk of which has now drained out through the filters.
A view into the plastic roofed tank - basically a thin film of sludge on the sand
Condensation on the roof

We had lots more discussions about where to get ‘better’ sludge, as in thicker sludge, and how to get it to site, given that the vacutug cannot remove the thicker material.  We inspect the various containers available at Practical Action, and more are bought from the market to enable the volume required to be collected.
300L square plastic tank
70L plastic barrels


Practical Action's backyard/ treasure trove, if you like that sort of thing
From some initial qualitative observations - putting my hand underneath each roof - the metal roof is very much cooler than I had been expecting, and so we paint it black to see if this will improve things.
Painting the shiny metal roof black
We retire to town for dinner, while Practical Action staff make the final arrangements with the sweepers (those who actually do the dirty work of sludge collecting) and wait for the evening and our next delivery of sludge.  We return to site at around 9pm to see our first delivery of the thicker sludge.
The first container from Batch 2 - Mmm thick sludge
The first container is indeed much more what I was expecting…and this is where the one of the problems with talking about sludge comes…the lack of appropriate adjectives!  This first load was kind of a thick soup/ McDonalds milkshake kind of consistency.  Unfortunately the next container was much more runny, and as each container was emptied into the beds, it was obvious that it would be difficult to ensure each bed received the same input material.  Ah well, we will do what we can. 




Once this batch had been delivered, we returned to town to have dinner (!) before joining the sweepers in the bus station to oversee collection of some ‘better’ sludge (there was some discussion amongst them of where to find the ‘good stuff’. 


Watching them work highlighted the dangers of this kind of job – there was no PPE (personal protective equipment) and a significant risk of splashes and slips.  They had absolutely no qualms about handling the dirty buckets and loading containers onto the lorry.

This batch was emptied into the flat beds, and again was a soupy consistency.

 

  In order to make at least the volumes consistent, we left then to do one final delivery and put the roofs back on, and retired to the hotel around midnight.


Incense being burnt to mask any odours

Still draining...